Slab foundation building in Springdale AR - a solid base planned before the pour

Building a house and need the ground floor poured? We plan the termite treatment, plumbing and inspections so your slab goes down right.

Pale concrete pool deck borders a blue swimming pool, with stone retaining walls and steps leading up to a house.
Service
Slab foundation building

How do you know you're ready to plan a slab?

  • A pour date on the calendar

    You've got a lot, a set of plans and a framer asking when the slab will be ready. That usually means the work under the slab needs sorting out now, because once the concrete's down, anything that got missed is buried for good.

  • Puddles where the house goes

    After a good rain, water sits right where the house is supposed to stand. That usually means the pad needs building up and shaping so water runs away from the house, and skipping it leaves your new slab sitting in wet ground.

  • Cracks in an old shop slab

    If you're replacing an old slab under a shop or outbuilding, you may see cracks running across it or a corner that's dropped. That often means the dirt underneath was never packed or stayed wet, and pouring new concrete on top just passes the same trouble along.

What goes into a slab foundation in Springdale?

Slab foundation building in Springdale means pouring the floor and footing of your house in concrete right on prepared ground, so the whole house sits on a base the ground holds up. Most of the work happens before the concrete truck shows up, in the dirt, the plumbing and the inspections, and that's where I put the most care.

Most folks who call us about a slab have a lot, a set of plans and a builder or framer waiting on a date. At B&C Springdale Concrete Company we're based in Springdale and work across Springdale and the cities around it, and the price of a slab mostly turns on the size of the footprint, how much dirt work it takes to get a flat, packed pad, the reinforcement you pick and how the plumbing lays out. The schedule turns on everything before the pour, because the plumbing, the termite treatment and each city inspection have to happen in order, and a wet week can push any of them back. The estimate I leave after walking your lot puts your own numbers on all of that. Arkansas counts anyone who bids on or builds a new home of one to four units as a residential building contractor, so it's fair to ask whoever you hire about their licence, and we're licensed and fully insured.

Details to note before an estimate

  • Lot location and how the ground slopes
  • Rough footprint from your house plans
  • Where plumbing comes up through the floor
  • Wet spots or standing water after rain

How we handle slab foundation building

A slab for a home gets planned well before pour day, so I start by going over the lot and your plans and lining up the termite treatment, the plumbing that runs under the slab and the inspections in the right order. Our crew digs out the pad and the footings and packs the subgrade, the dirt and base the slab sits on, in layers instead of just raking it level, because loose dirt settles and takes the concrete down with it. We shape the pad so water runs away from the house, set the forms and the rebar, the steel that keeps any cracks in the slab held tight, and once the plumbing is in, the treatment is down and the city has signed off, we pour early in the day, since a midday pour in the heat can leave a weak, dusty top. If the budget gets tight, I'll tell you straight that I'd rather trim the finish than the base, because nobody sees the base on day one and it's the one part you can't redo later.

Some lots and plans need a different kind of base than a slab on the ground, and that's our foundation installation work, done with the same eye on the dirt and the water. If you're a small business owner putting up a shop or office, we also do concrete parking lot building, so the lot out front gets the same packed base and planned drainage as the building.

  • Foundation installation

    Steep lots, special plans or a builder's spec may call for another kind of base, and we build those foundations from the dirt up too.

  • Concrete parking lot building

    Building a shop or small office? A concrete lot with a well-packed base and planned runoff holds up to daily traffic and hard rain.

What happens after you call about a slab in Springdale?

  1. Call or send the form

    Call (479) 231-3503 or send the form, and tell us where the lot is and whether you have plans yet. We'll get back to you and set a time for me to come out.

  2. I walk the lot with you

    I come out myself, look over the ground and your plans, and ask plenty of questions about how the house will sit. You get an estimate that lays out the base work, the reinforcement and the price in plain words, so you know what you're paying for.

  3. We pour and walk it together

    Our crew does the work with me on site, from the dirt work through the pour. Before we pack up, we walk the finished slab with you so you can look it over and ask anything.

Questions before you book a slab foundation

How much does a concrete slab foundation cost near Springdale?

Reinforced concrete slabs in the Fayetteville area usually cost about $7 to $11 per square foot, and that's the general market price, not our quote. Where your slab lands depends on its size, the dirt work, the reinforcement and the plumbing layout, so the estimate I leave after seeing your lot is the number to go by. Our work is backed by our satisfaction guarantee.

Should the soil be treated for termites before a slab is poured?

Yes, the University of Arkansas Extension Service advises pretreating the soil with termiticide, the chemical termite treatment, before the pour, because slab homes are so prone to termite attack. A treatment done right protects the house for many years and costs much less than treating later, which matters here since termites do heavy damage to Arkansas buildings every year and the repairs are often costly. The Extension also says a treated site that isn't poured the same day should be covered with plastic sheeting so rain and evaporation don't wear the treatment down.

What is the best way to keep termites out of a slab house?

The Extension's termite manual says a monolithic slab, where the floor and footing are poured in one continuous go, gives the best protection against termites. That's because it leaves no joints where termites can sneak in out of sight, so if termites worry you, it's a fair type of slab to ask your builder about.

What inspections does Springdale require for a slab foundation?

The City of Springdale Buildings Department handles inspections, and its list includes a footing inspection, a plumbing rough-in under the slab and a slab inspection before the pour. At the slab inspection the city wants the termite slip, the paper showing the soil was treated, and the insulation in place, plus a finished floor elevation beforehand when one's required, and the building permit has to be posted with trash containment on site before anyone calls for an inspection. We check what the city office wants, take care of the paperwork and book the inspections while keeping you posted, and the department answers inspection questions at 479 750-8154.

Is a post-tensioned slab worth it on ground that shifts?

It can be, since the Post-Tensioning Institute, the trade group for the method, calls post-tensioned slabs a cost-efficient, high-performance choice for homes on soil that shrinks and swells. Steel cables are tightened after the pour to squeeze the slab, and the group says that built-in squeeze resists soil movement better than a slab without it, and it can often go in faster with fewer pieces and less concrete. A post-tensioning foundation manual also stresses good drainage around the edge of the slab on swelling soil, and says the builder puts together a maintenance program to pass on to you, so it's worth asking for one.

How long does a new slab take before I can walk on it?

The usual guidance is that a slab should be walkable within 48 hours, though concrete takes a month to fully cure, which is the slow hardening it does as it gains strength. Waiting a week before putting heavier loads on it is the safe course, so it pays to set the framing date with that in mind.

Start planning your slab before pour day

Call (479) 231-3503 with your lot location, the planned size of the home and any termite or drainage worries, since changes are easiest while the plans are still on paper.